    Compute center deals sized to get approved.

    We bring you standalone sites that pay their own way on power and meet the checks towns are writing into their rules.

    Communities are blocking large data center campuses. Opposition now decides which projects get built.

    Contested projects fail about half the time, and banks now weigh community sentiment as a credit factor. Most new local bans target sites over 20 to 25 MW, which leaves room for standalone sites below that line.

    Data center electricity, 2030
    415TWh

    Projected global use in 2030, up from 415 TWh in 2024. The US accounts for almost half of the growth.

    IEA, Energy and AI (2025)
    Illustration of a compute center roof with dry coolers and a band of solar panels
    Distributed compute is happening.

    Inference is moving to regional sites built where the power is. EPRI and Nvidia are piloting 5 to 20 MW sites at substations with spare capacity, and CBRE sees urban infill of 2 to 20 MW gaining momentum.

    IEEE Spectrum on the EPRI pilots; CBRE, North America Data Center Trends H1 2026

    ~50%

    Of contested data center projects canceled in 2026. Banks now weigh community sentiment as a credit factor.

    Heatmap; Reuters, Aug 2026

    Resilience and community

    Criteria we work to

    Community opposition is now a credit risk. These are the criteria we work through with each operator before an introduction, each one something a third party can check.

    Sources: Gallup, Heatmap, Dominion Energy and local ordinances, 2026.

    The siteWhy it matters
    Sized to substation headroom and local rules, typically 5 to 15 MW, and not split from a larger campusMost new bans target sites over 20 to 25 MW, and splitting campuses invites tighter rules.
    Uses verified spare capacity at an existing substation, with no new transmission linesNo new grid build that lands on local bills. Above 15 MW, only where the substation proves it.
    Pays its own interconnection and grid upgrade costs upfront, and signs a contracted minimum demand with the utilityVirginia's large-load class starts at 25 MW. Below it, standard utility terms still allow both, so the site can choose to pay its own way.
    Closed-loop or non-evaporative coolingKeeps water off the list of objections.
    Grid and storage, with disclosed backup at every site; fuel and runtime follow local permitsCompute needs firm backup, and towns accept it best when it is sized, permitted and disclosed.
    Set back from homes, schools and parks, with noise limitsDistance triggers restrictions even for sites below the size line.
    Public disclosure before rezoning or the first hearingSecrecy turned land-use disputes into recalls in 2026.
    No special tax abatementTax breaks with few permanent jobs drive recalls and repeal efforts.
    First focus: Virginia

    The largest data center market in the US, inside PJM where data center load now drives power bills. Loudoun, Prince William and Culpeper have moved data centers from by-right approval to public hearings, so every site we work on plans for that. It is also where we are already working with communities on resilience.

    Resilience evaluation and investmentComing soon

    We are piloting a resilience evaluation layer, which turns this checklist into a scored record, and a resilience investment layer, so a site's benefit to the community can be assessed and financed alongside the power.

    What you get

    Illustration of a compute center aisle with server cabinets and liquid cooling pipes
    Fewer introductions, each one a fit

    We only bring you operators that meet the criteria you give us, with the answers to your first questions already in hand.

    Mid-market tickets, shorter terms

    Mid-size and edge operators need mid-market amounts on shorter terms than the hyperscale deals in the market today.

    Follow-on tranches

    When an operator pays on a first tranche, the next one goes to a borrower with a payment record.

    Community risk worked through

    Before an introduction, we work through the criteria towns now write into their rules: size, power, water, setbacks and disclosure.

    What we will ask operators

    These questions come from a team that ran supply chain risk and built ESG ratings for 9 million private companies at Dun & Bradstreet.

    • Customers and contracts: who buys the compute, at what price and for how long
    • Financials: revenue, burn, current debt and what it costs
    • Equipment and site: chips on hand or ordered, lease or ownership, power
    • Team: operating history of the people running the sites
    • Community fit: size line, power source, cooling, setbacks and disclosure
    • Credit support: guarantees, reserves and collateral the operator can offer

    How it works

    1. 1
      Book a call

      Twenty minutes on what you fund, your ticket size and terms, and what rules a deal out.

    2. 2
      We qualify operators

      We work through each operator's contracts, financials, equipment and credit support.

    3. 3
      We introduce the ones that fit

      You see the operators that match your criteria, with what we found.

    4. 4
      Close and follow on

      We support the deal through close and the next tranche.

    Who it fits

    • Private credit and infrastructure funds that want data center exposure
    • Equipment lenders financing compute and power equipment
    • Family offices that fund energy and digital infrastructure
    • Capital partners who prefer mid-market tickets and shorter terms
    Not a fit yet
    • Mandates limited to investment-grade borrowers
    • Mandates that only take hyperscale deals

    Questions capital partners ask

    Does Zero Circle lend alongside us?
    No. We bring you operators that meet your criteria. The credit decision stays with you.
    Do you finance GPUs?
    We lead with power and with revenue backed by customer contracts. GPU-only tranches are outside what we underwrite today.
    How does Zero Circle get paid?
    The operator pays us: a short retainer, and a fee tied to the close. We cover the details on the call.
    Have you closed a compute deal?
    Not yet. Zero Circle helps mid-market energy projects get to financing, and compute is new for us. The first introductions will come from the operators we are speaking with.

    Tell us what you fund.

    Twenty minutes on your ticket size, your terms and what rules a deal out.

    Or write to contact@zerocircle.eco.